Will this is the beast its going in, im running 2 reciver boxes. Just mind the ducts, it got very Hot here this summer
As u can see the BEC goes straight to the reciver, Ive backed out the ESC + & - wires and pluged the BEC in with the ESC signal wire. This is all in the closest reciver box.
Then ive used a extension lead from CH1 to the 2nd reciver box, then the steering servo plugs into that.
Now im still going to need to get the signal wires for CH4 & CH5 from the 1st reciver box to the 2nd (oh and the signal wire from ch3... thats another story it will be used to switch the steering signal wire from the ESC or Gyro)
So i dare say i will run 2 additional extension wires from box to box, but one will be the BEC power only & the other will be the 3 signal wires.
ATM the 2nd reciver box will be used to house the 2 mosfet controllers and the LM7805
Im thinking because there will be a 6v power allready in the 2nd box, may as well run the LM7805 of that rather than the battery voltage, that was it should be neater
What do u guys think?