I must admit that I am a sinner, in last two week I was working more on my new jet project Galeb G2 than on P 47.
Thunderbolt wing are ready for sanding. I removed all from them, cut front corners for position lights, and in next few day it will start sanding...
Few days ago I get package from FTE, with dummy engine...
Most work this days was in fuselage. I install servos for elevators (two Hitec HS 645 MG, one for every half), and next to them standard Futaba servos for Robart air control valve. There are two valves, one for doors, and another for retract.
I was always trying to put all stuff as front as possible...
Big air tanks are installed also. They are on the styroform carriers and are clamped with Velcro...
Air valve on right side activated switch for light system...
Wider, front end of this part will carry all batteries. All batteries will be fix with Velcro. Servo in the middle is for rudder...
Regards
Mirce