Yesterday I got wing joiner for Zero. My friend cut to the proper measure wing joiner for Meister Foke Wulf also.
I placed wing joiner in the wing to see is everything OK. It lying perfect...
Next step was to made rear side of the box which will connect spars and ribs. I got strong construction, and now can work easier with wing joiner, and that part of the wing...
I made all those parts from poplar ply.
For now, rear plates are not glued between rib 4 - 6...
Plywood which is by the first rib have angle same like middle of the wing joiner...
I take a lot of care to wipe all glue from the side where wing joiner will come...
Now I study plan to see what Meister Scale told about mid spar. I saw that they made it from parts which will be glued between ribs...
I have other idea, so I made mid spar from one piece, and put it on the wing joiner. I need to be very precise when was increased opens on ribs...
When you take wing joiner out, mid spar will stay like this. Don't forget, mid spar is not glue yet...
Now come moment to glue half ribs for landing gear pate. I must do that, because without it I can't continue work on wing.
But, I will not glued plates until I get landing gears.
I call Dino, and he told me that in one - two weeks he can get landing gears from Siera.
In meantime I continue work on elevator...
That's all for tonight... Bye
Mirce