RE: AMR 33% Waco YMF-5 Build
I did manage ot get all 15 hinges in the tail surfaces re-drilled tonight as well as 2 of the wing panels and aileron's.
The local H/S was out of Robarts so I had him order me a pack of 50. I have a few on hand that I used for checking the hole alignments as I drilled the holes. My fabric order is due to arrive by the Big Brown Truck tomorrow. I probably won't get started with fabric until Saturday.
Later!!
Anthony