Alot of post today,
David thanks for the comments.
VJ you made feel guilty about the rivets so I had to put them on my plane
Scott the corrugations are spaced 5/8" apart. The 1st one on the inboard end is 3/4" in from the edge. This should put your last corrugation approx 3/4 from the end. There are 34 corrugations top and bottom as per the full scale. I suggest drawing them out using the dimensions supplied and see how it looks. It can be a pain keeping the bottom corrugations in line with the top.
TFF you are correct, there is nothing cheap about this build so why should the paint be. $130 in fabric/dope/polyc , $225 in stitching and tapes and $300 in paint. Hhhmmmm don't let my wife see these numbers
Off to work on an aileron.
Anthony