RE: ***CUB BROTHERHOOD***
Back to work again!!!
Making both elevators now.
First line drawing was made, basically just proper outline drawing.
Balsa strips were cut from the sheeting into the size needed. Soaked in the Windex for 25 mins, then
started to lay each strip one by one against the inside curve of the pins. This is helping these strips to pick up right shape as they dry. Presently held in place. Tomorrow I will glue these together as officially laminated trailing edge.