Bandit ARF MK II with p-100
I'm building BARF MK II with a p-100. The supplied bypass appears to be for a 120/160 size turbine. I have installed the p-100 and between the exhaust cone of the turbine and beginning of the pipe there is a 2.25" gap. To me it looks like a large gap but there is not much that I can do. The turbine is as far back as possible on its clamps. The instructions say the gap should be about 1.5". I'm just wondering if this is ok or is there something I'm missing?
Thanks
Mike