RE: Hal DeBolt's / Midwest Pattern Master
The wing is built except for installing the landing gear blocks, the bottom sheeting, and wing tip sheeting. Ailerons still have to be made. It is amazing how rigid this structure is considering starting with flimsey 1/16" sheet and 1/4" sticks. But that is the results of D tube constsruction. Next will be the stab. Ribs are cut so that shouldn't take too long to complete. The fuselage will take the most time having to fit and install all of the equipment.
It feels good to know that I will have a Viscount again and that this time it will be a flyer.
I hope you are enjoying seeing the progress.