RCU Forums - View Single Post - DERIVATIVE, New 2X2
View Single Post
Old 07-08-2014 | 06:50 AM
  #228  
MTK
Senior Member
 
Joined: May 2004
Posts: 5,386
Likes: 0
Received 1 Like on 1 Post
From: Whippany, NJ
Default

Some photos. Foam core prep was started with lining of the foam core with masking tape. Typically this step would not be required but in my case, the foam was very low density (<1/2 lb stock) and tended to fall apart. The tape added some resiliency so I could work with the cut stations.

Rib accuracy probably rivals laser-cutting. The Lost Foam method is worth the trouble I think. Weights are rather low about 20 grams each panel without the top sheet and socket installed yet.

I'll post final weights when I have the parts ready for covering.
Attached Thumbnails Click image for larger version

Name:	Stab foam core.jpg
Views:	763
Size:	187.3 KB
ID:	2012582   Click image for larger version

Name:	Foam core prep.jpg
Views:	393
Size:	257.0 KB
ID:	2012583   Click image for larger version

Name:	Stab panels.jpg
Views:	510
Size:	181.1 KB
ID:	2012584   Click image for larger version

Name:	Stack of stab ribs.jpg
Views:	342
Size:	220.3 KB
ID:	2012585   Click image for larger version

Name:	Core with ribs.jpg
Views:	193
Size:	216.7 KB
ID:	2012586   Click image for larger version

Name:	Lost foam.jpg
Views:	399
Size:	214.4 KB
ID:	2012587   Click image for larger version

Name:	Rib install.jpg
Views:	355
Size:	269.8 KB
ID:	2012588   Click image for larger version

Name:	LE Shaping.jpg
Views:	410
Size:	168.8 KB
ID:	2012589  

Click image for larger version

Name:	Glue drying.jpg
Views:	168
Size:	254.4 KB
ID:	2012590   Click image for larger version

Name:	All ribs in.jpg
Views:	363
Size:	233.2 KB
ID:	2012591   Click image for larger version

Name:	Socket build.jpg
Views:	184
Size:	159.8 KB
ID:	2012592  

Last edited by MTK; 07-08-2014 at 10:28 AM.