RCU Forums - View Single Post - Large scale Luftwaffe/Axis forum..
View Single Post
Old 11-09-2014, 08:44 PM
  #943  
invertmast
My Feedback: (23)
 
invertmast's Avatar
 
Join Date: Dec 2003
Location: Capon Bridge, WV
Posts: 8,198
Received 225 Likes on 116 Posts
Default

Originally Posted by vertical grimmace
There is sort of a sequence that you need to follow. I did the Stab first, then the rudder, Then the fuse. The fin is built right away with the top fuse half, hanging the firewall over the edge of your bench. Then the cockpit has to be installed, top half of fuse sheeted.

Then the wing is built. I have a 3 piece wing. It can only be sheete so far until you get it mounted, which is where I am at now. My outer panes are essentially done. Pay close attention to the trailing edge. That is where this design is tricky.

Ok thanks. Ive got the stab framed up, i just need to install the Le cap and shape it. Ive been holding off on doing the elevatora and rudder as those are going to be laser cut interlocking parts.

Ive mostly beene debating on either framing up the wingsgo roughly the same stage yours are in and then starting the fuse, or just go straight into the fuselage.