The main pontoon has been removed from the building jig, the
jig-rod exit holes out the backsides have been filled and shaped cradles of
EPP have been Gooped to particle board
shelving material. The main and secondary pontoon supports have been
cemented in place and a tapered reinforcement "sub-floor" has been shaped
with a two way taper and sandwiched in along the sides of the main support.
It was then sanded down flush with the rounded formers and is now ready to
have the remainder of the deck planking to be fitted and cemented to it and
the other adjacent formers.