Having finished the cabane cover I turned to the wires and javelins. The wires have been installed temporarily, they will get thread locked on final providing I can get it in the trailer assembled. The javelins have been cut to length, tomorrow I will cut the slots for the wires, make the hold block, and hopefully get them painted. At that point I will be done other than the pants and canopy which is suppose to be here, we'll at home anyways, on Tuesday. This build will be complete the week after delivery of those parts.
Last edited by acerc; 01-26-2015 at 07:31 PM.