RCU Forums - View Single Post - Skymaster plus 1:5.5 BAE Hawk
View Single Post
Old 02-22-2015, 06:44 AM
  #493  
ticketec
My Feedback: (2)
 
Join Date: Jul 2003
Location: Brisbane, QLD, AUSTRALIA
Posts: 2,787
Likes: 0
Received 8 Likes on 4 Posts
Default

Today I started cleaning up the wiring in the Hawk.

I started by removing the forward fuse section from the aft to make it a little more manageable to work on it. I put safety clips on all the connections and also labeled everything so if I need to trouble shoot something It will be a lot easier to deal with. All that is left now is to apply some aluminium tape over the wiring to protect it from heat should the unthinkable happen .

I also manufactured a ply doubler for the questionable landing gear bearer and have hysol'd that into place. If I get some time tomorrow I will clean it up, re-drill the new bearing to accept the screws and attach the landing gear to the wing.

The next job is to start to tackle the nose section wiring and plumbing. a big cleanup job is required there as well as to start to plan where the powerbox will go... need to buy that first.

Thanks

dave
Attached Thumbnails Click image for larger version

Name:	IMG_2600.JPG
Views:	168
Size:	414.2 KB
ID:	2075367   Click image for larger version

Name:	IMG_2601.JPG
Views:	166
Size:	378.1 KB
ID:	2075368   Click image for larger version

Name:	IMG_2603.JPG
Views:	145
Size:	425.3 KB
ID:	2075369   Click image for larger version

Name:	IMG_2604.JPG
Views:	155
Size:	475.4 KB
ID:	2075370