Once both tip floats were bottom planked, an upright holding fixture
was constructed from EPP foam for the cradles and AZAK PVC for the base.
While waiting on a 1/8th" light balsa shipment to plank the topsides, all
end cap pieces were cut to shape, ready to be tack-cemented in place when
the topside planking gets finished.