Originally Posted by
michaelnel
Engine is mounted, fuel tank installed, fuel lines run, all control servos and control rods installed and adjusted and tested, windscreens and turtle deck installed, working on the cowl now.
It's true that the first 90% of the job takes the first 90% of the time, and the other 10% of the job takes the other 90% of the time. The detail work is pretty involved!
Sounds like your moving right along like to see some pictures. The O.S. FS-120 should be plenty power and sound good at the same time.