Progress.
The third hinge with the bearings and the two control arms are test fitted to the elevator.
I have adjusted the hinges and I am gluing them in with gorilla glue as I like the expansion action it offers.
Once this sets up I will do the other side, then the elevator's, then the torque rod.
TB