RE: Pitch Coupling Mixing - Leave it on ?
You're exactly right. If the plane needs a mix to fly straight, then leave it on all the time, all maneuvers. If throttle mix is a problem on the landings, then the CG needs to come aft to fix the landings and the uplines. Have fun!
CJ