RCU Forums - View Single Post - 8th Scale Aviation's, "CzechMate" Short-kit, Group build
Old 05-18-2016, 11:15 AM
  #235  
MFLOOD3800
My Feedback: (51)
 
MFLOOD3800's Avatar
 
Join Date: Apr 2004
Location: beaver, UT
Posts: 1,662
Likes: 0
Received 1 Like on 1 Post
Default

Originally Posted by Iron Dog
Hi "Flyer",

Sorry it has taken so long for me to answer your question, but life has been a bit hectic for Tim and I, lately. We've only met twice for the build in nearly two months, and I haven't even been able to make time to keep up on posting the progress we have actually made, to date.

To answer your question, we will reinforce the joint holding the box in-place. But, beyond simply using epoxy alone, we will eventually reinforce this assembly by fiberglassing the joints.

Flyer
On all these warbirds with a YS and high Nitro many if not all of us, reinforce every fire wall, whether it is an ARF or scratch built. On my Tsunami, I used tri stock, with 5 oz cloth and epoxy. I think because I run the bigger YS115 mine needs a bit more than , say a YS70 or 80, but those too need some reinforcing. Nothing worst than having it come loose on race day, when it is only a 10 minute fix in the shop to start with.