RCU Forums - View Single Post - 8th Scale Aviation's, "CzechMate" Short-kit, Group build
Thread
:
8th Scale Aviation's, "CzechMate" Short-kit, Group build
View Single Post
05-21-2016, 09:43 PM
#
244
Iron Dog
Join Date: Feb 2009
Location: Sacramento, CA
Posts: 1,348
Likes: 0
Received 3 Likes on
3 Posts
I used an ice pick (scratch awl) to mark and start the hole, in the position needed for drilling the elevator halves for the joiner wire. Carefully drill the 3/32" hole, constantly checking and assuring alignment, both vertically and horizontally, into the control surface. Be careful not drill beyond the needed depth.
A small amount of 30-minute epoxy is mixed, and the joiner wire is epoxied into both elevatore halves.
(I think Tim approves of my elevator assembly!)
Attached Thumbnails
Last edited by Iron Dog; 05-21-2016 at
10:38 PM
.
Reply
Like
Iron Dog
View Public Profile
Send a private message to Iron Dog
Visit Iron Dog's homepage!
Find More Posts by Iron Dog
View iTrader Profile