RCU Forums - View Single Post - Pz IV Ausf G DAK Build
View Single Post
Old 06-04-2016, 03:59 AM
  #137  
philipat
 
Join Date: Dec 2007
Location: Okinawa, JAPAN
Posts: 2,898
Likes: 0
Received 4 Likes on 4 Posts
Default

Time to finish installing the power train. Completed:

- Glued in the styrene stiffeners in the front of the lower hull
- Installed drive shaft bearings (height was adjusted slightly as a result of switching to the Mato gearboxes)
- Gearbox attachment points were reinforced using aluminum tubing (1/4" ID, 9/32" OD, .014" wall thickness)...their lengths extend an extra 1.5-mm (total of about 5.75-mm long) to replace the washers that were used as spacers to raise the gearboxes.
- Gearbox mounting plate is secured with #4 (#0 drive) self-tapping, square pan head screws. They’re ½" screws that have been cut down to about 7 mm. (possible source: http://www.mcmaster.com/#tapping-screws/=10t9c2g)

I’ve put some lithium grease and 3-in-1 oil into the gearboxes following thecommander’s guide (http://www.rcuniverse.com/forum/rc-t...gearboxes.html). I tried using some M3 PTFE washers in gearboxes (source: http://www.mcmaster.com/#catalog/122/3251/=10t9gqc). But they didn’t seem to work. They seemed to cause the gears to bind.
Attached Thumbnails Click image for larger version

Name:	IMG_0001 (2).jpg
Views:	63
Size:	173.5 KB
ID:	2165716   Click image for larger version

Name:	IMG_0002 (2).jpg
Views:	60
Size:	140.7 KB
ID:	2165717