Anyone know of any detailed build logs with linkage/servo/interior installation pics? Even if it's just pics on a Facebook page?
I was hoping I'd get to examine them up close at Kentucky Jets, but they were not in attendance.
Specifically, Comp ARF states to use aluminum arms only in specified lengths AND to use the supplied clevises as they don't leave room for ball link hardware. But damned if I can't find aluminum horns that check all those boxes at the same time (aluminum, proper length, non-threaded clevis pin holes). Will be using Futaba servos.
Last edited by Auburn02; 07-17-2017 at 11:42 AM.