Nose gear required shimming to fully retract without interference. NG door servo installed to complete NG installation.
Lighting controller installed.
Fuel shut off valve installed.
Air lines plumbed to retract and brake valve.
Servo leads routed through equipment tray in preparation for CB200 installation.
PS...the photos are hard to load on RCU in correct orientation. Apologies for those that are rotated or distorted.
Last edited by jsnipes; 07-29-2017 at 01:13 PM.