Guys who are flying this model already, do you have your service items (switches, air fill, fuel fill, fuel shutoff valves) all accessible through the nosecone or do you raise the canopy and remove parts of the cockpit between flights? With no hatches around center ship, been trying to figure out how to lay those items out without creating unnecessarily long runs for everything but there may not be any way to avoid it. As of now I'm looking at having probably 12 or more feet of fuel line per turbine when you consider going from fill port in the nose to UAT near nose gear, then back up front to a shut off valve in the nose before going back to the pump and then turbines.
I have not yet started on the cockpit - once assembled can it be easily removed to access fuel shutoff valves and such if I were to install them around the nose gear mount instead of at the nose cone?