My fuselage construction is finished except for the front hood deck.
Will do that last as when done you cant get to much under it. I made a sliding mount for the gas tank. The dle 35ra motor detaches from the main motor mount. I am close to 14 pounds , weighing everything i have finished + tanks, engine, smoke pump & tank. I still have the wing l.e. And tips to do. The weight at this point is 14 pounds.
I have some extra fuse sides * sticks left as i bought and made lighter parts..
I am 89 as of dec 8 2017 so i am a slow builder. 2 years so far. Hope to fly in the spring of 2018.
Glad to see this post is alive as well as others good luck with yours.
Trainermaster80
BY THE WAY ANYONE USING FISH LINE FOR FLYING WIRES ON RUDDER & ELEVATOR OF THE DYNAFLITE SUPPER DECATHLON? IF SO WHAT TYPE AND SIZE LINE AND BRAND DID YOU USE?
I'LL APPRECIATE AN ANSWER FROM ANY KNOLAGEABLE SOURCE. THANKS FRANKI TRAINERMASTER80
Last edited by trainermaster80; 11-22-2017 at 03:45 PM.