Originally Posted by
smaze17
Oli, what do you reckon the wait time is for a kit if reserved at this time?
Thx bud.
-S
Batch 1 will get delivered in about 8 weeks from now. Maybe less than this, but I want to take my time for the very first airframes, as we stabilize our production process.
Batch 1 is sold out already and production has started.
Batch 2 lead time should be about 10 weeks from now.