The top and bottom sheeting glued on and drying. I should be able to remove wing from jig as the next step. Aileron and servo location will come later. I finally was able to get some epoxy glue. It sure did take a while to get that glue. I did a little work on fuselage. I'll join the sides soon. AND I got that balsa storage rack out of my way. Now I need to install it in my garage.