latest update,, valley flyers page,,
Update 6/13/19:
Letter from the FAA
to Jason Masfield-President of the Valley Flyers
Jason, thank you for talking with me.
We are diligently working on the Letter of Agreement (LOA) between you and VNY ATCT.
(Van Nuys Air Traffic Control Tower)
This is a process that traditionally can take as long as 6 months to complete. We are expediting your LOA and hope to have it completed soon.
Until an LOA is signed and in place, no person(s) have authorization to fly at that location. It is inside of Controlled Airspace, and according to the laws and regulations, an airspace authorization is required to operate an sUAS aircraft including RC Model Aircraft.
I hope this helps and I will keep you updated on the status of the LOA.
FAA