RCU Forums - View Single Post - Ziroli 1/7 (120") B-25 B scale build
View Single Post
Old 08-31-2020, 10:07 PM
  #66  
rossmick
Senior Member
 
rossmick's Avatar
 
Join Date: Jun 2010
Location: Vail, AZ
Posts: 356
Likes: 0
Received 8 Likes on 8 Posts
Default Wing center section / main gear 2

This is very slow going. Object is to get the gear out so they can be converted back to air from electric. Sheeting is tough enough but cutting out the doors is a real choir. Also slow going on getting the hatch built and opening created. Got one of the gears removed, now for the other. Matching nacelle sheeting to the wing will be next undertaking. Could have done a much better job preparing the nacelles for the gear door cut out. Learning as I go.

Doors removed

Hatch

Slowly cutting doors out

Doors and gear removed.