RCU Forums - View Single Post - Ziroli SBD-3 Dauntless build
View Single Post
Old 07-08-2021, 08:15 AM
  #91  
BatteryBob
 
Join Date: Sep 2014
Location: Scottsdale, AZ
Posts: 169
Likes: 0
Received 0 Likes on 0 Posts
Default

I started with a sander, then went to the dremel and finally pulled out a wood file. After the dust settled, I think the firewall ring is getting close to the scale shape.


A whole bunch of material on the firewall ring needed to be removed.


You can see the firewall ring inside the cowl. Now the cowl is about 2/3 past the face of the ring.


Removing balsa and contouring the ring provides this gap between the cowl and the ring.

I didn't measure it yet, but I'd estimate the cowl has been moved back about 1/2".