Finally, things at work have slowed down a bit, that is if you call multiple double(17hour) shifts slowing down. I've gotten most of the forward cross frame drawing done, just have to figure out the runner depth and angle. All of the extra hours at work did let me order a new toy that should speed up the build a little. This arrived today:

Should make the miter cuts I've always had to do with a Exacto saw and miter box a lot faster and more accurate. Hopefully, I'll get to try it out tomorrow, along with a table saw I haven't used yet