RCU Forums - View Single Post - CARF-Models Mig 17 build thread
Thread
:
CARF-Models Mig 17 build thread
View Single Post
06-11-2022 | 07:33 PM
#
115
Airforce7
My Feedback: (
31
)
Joined:
Feb 2004
Posts:
1,125
Likes: 18
Received 18 Likes on
17 Posts
From:
Brentwood, CA
Landing light install
Finished up the tail nav light and servo leads for the elevators and then moved on to the landing light install today.
I opened up the uniLight landing light packaging and began looking over the parts. It’s very nice however I noticed right away it needed some adjustments. The servo was pre installed but it was facing the wrong way. Disassembled it from the frame and then reinstalled it correctly. Attached the servo arm and the linkage and did some bench tests with my radio. All looked good.
Next I cut into the wing to get better access to install the light assembly as well as cut the opening for the light to deploy out from. Did a quick fit check and noted some things I may need to do before glueing it in permanently. During the fit check the landing light became unglued from the frame. I’m not sure what kind of glue they used but it seemed inadequate. Something like this should be screwed down as it deploys into the airstream. I’ll look at this a bit more this coming week.
Landing light assembly top view
Landing light bottom view after opening packaging
Surface marks prior to drilling out
Dremel openings in wing
View through new opening to help with install
Landing light assembly with opening in wing
Alternate view of the landing light assembly
Test fit of the landing light
Deployed landing light test fit
Landing light test fit front view
Delaminated landing light
Reply
Like
Airforce7
View Public Profile
Send a private message to Airforce7
Find More Posts by Airforce7
View iTrader Profile