Pipe mounting

Some final adjustments made with drum sander to allow pipe to be installed from turbine hatch with bell mounted

A small radius needed to allow pipe to slip in the tail

Four plywood pipe standoffs taped in place

Stand off positions marked on top and bottom

Standoff epoxied in place

Front ends beveled to allow pipe to slip in easier

Standoff cured ready for trimming

Standoff marked and trimmed with sanding drum

Bottom fiberglass part dry fit

Bottom fiberglass shell epoxied in place

Top fiberglass shell epoxied in place

Tape removed

The gap between the bottom foam parts was filled with thick epoxy and two layers of fiberglass cloth to give it strength

Primer applied

Foam filler applied and sanded. 3 more coats of primer applied and sanded. Primer applied to aft end of pipe.

Came out ok