Default Episode 05: The continuing production of bogie wheels

This week, the shape of the bogie wheel has been completed, it has been trimmed, and the production of the bearing insertion type connection joint has been completed.

Regards,
Young



Bogie Wheel Work Continues Last Week

Install spokes on the viewing wheel

Spoke operation completed

Create detailed parts with 3D printers

Identical drive wheel cover

Flanges to secure the same drive wheel cover

Remove the burrs on the rear of the bogie wheel with a hand grater.

Finish with a flat grinder

The sharp edges go smoothly, too.

Completing the grinder operation

Stand by for next action

Connecting joint lathe processing

Smaller hole than bearing inner diameter

Hole work completed

Hole operation for bearing fixing

External diameter machining of joint to fit the internal diameter of the bogie wheel

Joint shape machining progress

Shelf machine capacity is small, working repeatedly several times

Joint shape machining completed

temporary assembly

Joint connection with two bogie wheels, bearing assembly example when installing

Check the clearance of the center guard of the track.

Prepare the flanges for hole work to match the bogie wheels.

Continued in the next episode