Here is where I start changing out hardware that come supplied with the kit and start adding what I think will work better. Above is the 1/8 landing gear and steel mounts that came with the kit. Below is a decent set up of 5/32 gear and a Dave Brown .40 mount which allows me nose steering. I will be using the lower set up.