Main Gear Door Servos and Main Tank Screws installed.

Gear door servos re-installed.

Servo covers had to be trimmed to clear the back of the main tank.

Servo covers installed and wire channel cut in foam with hot wire cutter.

WIre channels cut on both sides.

Servo wires placed in wire channels.

Wires taped in place with Tevyk house wrap tape from Lowes.

Fuel tank screws painted and installed.

Servo well cover trimmed to fit and glued in place with foam glue.