RCU Forums - View Single Post - Pat King 45% Flying Fool
View Single Post
Old 11-26-2024 | 03:18 PM
  #14  
AJ Sun
Senior Member
 
Joined: Sep 2023
Posts: 585
Received 34 Likes on 34 Posts
From: Granbury Texas
Default

Well Stan Frady said my Four inch Belcrank will ship out in a few days. Expect holiday traffic for a small delay. My check took several days. Now to get the elevator control rod made. Stan might do it. But if not I will try to tool up and build one. Just getting the material and steel is expensive, have to buy a lot to make a little part. My glass arrow shafts finally arrived. Got it cut and one 4/40 rod installed used Epoxy and a plug I used out if the lazer cuts. It was perfect fit. Keep them lines straight and tight. AJ