Well several of my parts ordered have arrived and Stans Bel crank is great attached the .032 lead out wire, the fibreglass control rod worked out great, now to get it attached and the Bel crank attached that's going to be some what difficult. Cut the spacers and measured the space. The plan called for a rod. But that's impossible a rod just will not work. I am using a blind but and 4/40 long machine screw. Lots of adjusting and adapting to get this to work. Kinda brain storming this assembly. Might attach the horizontal. And elevator to get the right length of my fibreglas control. Just keeping them lines right and straight! AJ.