RE: RE: OMP YAK54 NOW COVERING!
OK now I'm confused, Mike I have both the 3/8" square balsa joiner that connects both elevator halves together and the metal rod joiner that ties both elevators halves together. What am I supposed to do in this application? Am I supposed to cut the 3/8" square balsa that ties them togeather?
I've alread got the blocks in place and the holes drilled for the rod.
Thanks
Blackie