RE: Mid-Star 40 build
More progress tonight. Top trailing edge sheeting glued on. Leading edge glued on. Top main spar and top front spar glued on. Then I had to move onto the fuselage, as the next step for the wing is to start removing pins to attach the center sheeting. So the glue dries tonight. I started working on some of the fuselage steps. The 2 F-1 formers were glued together and set aside. The F-2 and F-2d were glued together and set aside. The landing gear block was marked and drilled for the blind nuts. The blind nuts were installed, and the block was set aside. Then I glued the fuselage sides and doublers together, taking care to make a right and left side. The fuselage sides are what you can make out underneath the toolbox.