Santa came early!
[link=http://www.kc-10.net/gallery/albums/album16/DSC01828.jpg]
[/link]
I installed the mains tonight and will do the nose tomorrow as that one is gonna take some time.
Installing the mains was pretty straight-forward. I did have to reconfigure the Robart 630's so the cylinders would face forward when the gear is retracted.
A little trimming of the gear opening lip is required to clear the struts, but it only took a few moments. I've outlined the trimmed area in red:
[link=http://www.kc-10.net/gallery/albums/album16/DSC01840.jpg]
[/link]
Inside shot:
[link=http://www.kc-10.net/gallery/albums/album16/DSC01838.jpg]
[/link]
Both mains installed:
[link=http://www.kc-10.net/gallery/albums/album16/DSC01837.jpg]
[/link]