I had to take a couple days off due to marital pressure
Last night's progress:
1. Glued wing tip to left wing.
2. Glued center sheeting to top of right wing.
3. Marked forward edges of the elevator for the hinge line. Used a handy tool that was included in my Tiger 2 kit to mark the centerline.
4. Sanded the forward edges of the elevators at a 45degree angle.
5. Marked the elevators for the joiner wire. Drilled and notched for the joiner wire and epoxy'd it in. Pinned it to the table using a straight edge to ensure the front line of the elevators is straight.
6. Glued stab end tips on to the stab.
This morning, I unpinned the right wing half and flipped it over. Glued the bottom front turbulator spar in place.
Tonight's TODO:
1. Mark and cut the stab and elevators utilizing provided lite ply Stab Tip Template.
2. Glue on bottom sheeting on the right wing half.
3. Start working on fin and rudder.
For the wing tips, I utilized both carpenters glue and thin CA to glue it on. Most of it is glued with carpenters glue. I left 3 or 4 spots without glue, held the wing tip in place, and used thin CA to tack it in place. I was worried about it shifting before the carpenters glue dried.