Progress update after the holidays. The wing and stab are mounted and the surfaces hinged. The belly pan pipe tunnel and pipe mount are completed but not sealed yet. The engine and Ice Point gear are mounted. The Ice Point gear gives lots of clearance with a 17" prop installed. The rear pipe mount is screwed and epoxied to the wing hold down doubler so that it can be removed when the wing is taken off. I imagine I will use an o-ring hold down ala AeroBob.

Thats it so far.