RE: DZ Tuning
Brian,
I expect to have the first one done in about 2 weeks. I am doing the first one electric and the second with a 160. It will be a toss up of which one I want to fly as they both have extreme amounts of power but I really like the way that the electric does not vibrate at all.
Andrew