RCU Forums - View Single Post - Insight build...another wood roach.
View Single Post
Old 03-27-2005 | 04:57 PM
  #13  
flyintexan's Avatar
flyintexan
My Feedback: (1)
 
Joined: Apr 2003
Posts: 1,207
Received 2 Likes on 1 Post
From: tomball, TX
Default RE: Insight build...another wood roach.

I received a question about the spacing beneath the landing gear plate. Here is a pic of the space created below the gear plate by placing some scrap 1/16" below the plate during the gluing process. This is necessary because the bottom of the fusebox will be fully sheeted with 1/16" balsa (cross-grain) and serve as the pipe tunnel floor.....we don't want those ugly blind nuts or screw ends to poke through into the pipe tunnel.
Attached Thumbnails Click image for larger version

Name:	Ol31543.jpg
Views:	56
Size:	29.5 KB
ID:	250038