RE: Rodger Dodger Build
Well, day 6 of the build, and it's starting to look like a plane now(look further down).
Started off by adding the wing /fuselage hold down plate(twice - I mismeasured the first one), epoxied in with 30 minute, and taped the fuse sides to hold it while it dried. Also drilled hole for wing dowel and installed that again with 30 minute. While all of that was setting up, I added the lower fuselage front sheeting(1/8" balsa). As usual, glued from the inside to keep the exterior nicer.