RCU Forums - View Single Post - Cold Duck - Build
Thread
:
Cold Duck - Build
View Single Post
06-28-2005 | 08:39 AM
#
15
8178
My Feedback: (
17
)
Joined:
May 2004
Posts:
4,351
Likes: 1
Received 13 Likes on
7 Posts
From:
Atlanta, GA
RE: Cold Duck - Build
View of the completed vertical and horizontal stab with hinges and elevator joiner wire test fit. The Du-bro standard hinges are counter sunk into the stabs and control surfaces to create a zero gap hinge line. The leading edge of the control surfaces are beveled with a sharp edge at the hinge line to provide the sealing point. This eliminates the need for unsightly sealing tape on the hinge lines. The shaping and sanding work on the stabs is almost complete. I increased the span of the horizontal stab 3 1/2” and the width of the elevators ½”. This change increases the wing/stab percentage from 20% to 25%.
The main gear mounting blocks have short hardwood dowels epoxied to the backside and the blocks drilled for the landing gear struts.
My Dynamic Balsa shipment with my balsa supplies and foam core should be delivered later today.
Attached Thumbnails
Reply
Like
8178
View Public Profile
Send a private message to 8178
Find More Posts by 8178
View iTrader Profile