Start with the shaft size you are using, and build up some KS brass tubing into your stuffing tube. Solder the small pieces into each end of the tube. Run the tube out the bottom of your hull, and epoxy it in place. Fill that with a little (not to much) white bearing grease, and you are ready to run the propeller/drive shaft.