RE: Excelleron 90 build in progress
Update.
I got the horizontal and vertical stabs glued in place, did that last night.
Next step is to install the control surfaces back there then get the pull-pull system installed, of course, with the servo's.
This project is moving along quicker than I imagined. Hey, maybe get it flying before Thanksgiving!! That would be nice. Then I can sit there and look at it until the winter goes away..ha.. oops.
DS.