RE: Excelleron 90 build in progress
I got all the plumbing in last night with fuel dots and check valve and installed the needle valve extension. I still have to open that cowl up for the exhaust header and muffler and install battery, switch, and receiver permanently. I then want to go over the entire model with an iron and make sure everything is down and seal the edges. I wonder what would be best to use for that?
Gordie