RCU Forums - View Single Post - Excelleron 90 build in progress
View Single Post
Old 10-28-2005, 11:26 AM
  #16  
elan120
My Feedback: (1)
 
Join Date: Sep 2004
Location: Fremont, CA
Posts: 302
Likes: 0
Received 0 Likes on 0 Posts
Default RE: Excelleron 90 build in progress

Once I have the plane in the air, I will report back if the tape hinge holds up.

Since the tape hinge goes on so easy, I sealed the gap on all control surfaces including the rudder and elevator. I used to seal the gap with monokote as well, but the tap hinge is a lot easier to do, I just hope it will hold up over time.

Kevin